1. SPECIFICATIONS OF Concrete spacer PCA-80

arrow_right Name
: Concrete spacer PCA-80
arrow_right PCS / carton
: 80 pieces
arrow_right Carton weight
: 15,5kg
arrow_right Pallet Gross Dims
: 1125 x 1130 x 1070 mm
arrow_right Cartons per pallet
: 96
arrow_right Container 20 feet
: 10 pallet
arrow_right Item code
: PCA-80
arrow_right Brand
: PRECA
arrow_right Manufacturer
: Preca Corporation
arrow_right Material
: Concrete
arrow_right Used for
: Top rebar
arrow_right Breaking load
: 3,5 KN
arrow_right Concrete cover
: 80mm
arrow_right Packing
: Carton
arrow_right Carton size
: 278 × 188 × 231 mm

2. OVERVIEW – WHAT IS THE 35MM BORED PILE CIRCULAR CONCRETE SPACER PCA-80C?

The 35mm bored pile circular concrete spacer PCA-80C is a circular concrete spacer used to maintain the clearance between the rebar cage and the borehole wall or diaphragm wall surface, creating a 35mm protective concrete cover layer. The product is arranged around the perimeter of the rebar cage to help keep the cage in its designed position during hoisting, lowering, and concrete pouring. The distinct feature of PCA-80C is its compact Ø80mm diameter, suitable for rebar cages requiring a 35mm protective cover layer and limited working space. The circular profile helps reduce the risk of snagging edges as the steel cage moves along the borehole wall; the selection of diameter and cover thickness must be based on the bored pile or diaphragm wall engineering drawings.

3. KEY FEATURES AND STRUCTURE

PCA-80C features a wheel-shaped profile with a nominal diameter of 80mm, providing a 35mm protective cover from the rebar to the outer surface. The circular structure distributes contact points along the perimeter and helps minimize friction and snagging while the rebar cage is hoisted and lowered along the borehole wall. The specific suitability of this model lies in its compact Ø80mm diameter, suitable for rebar cages requiring a 35mm protective cover layer and limited working space. The product functions to maintain the centering and spacing of the rebar cage, unlike flat-base spacers used under slabs or H-shaped spacers used between two rebar layers. The spacer body is cast from concrete, featuring a hole or mounting point to secure it to the rebar according to product specifications. During installation, ensure that each spacer operates in the correct orientation, remains free from cracking or breakage, and does not obstruct the cage lowering process. Spacers must be distributed around the perimeter to prevent the rebar cage from tilting or shifting to one side.

4. USER GUIDE

1. Check technical drawings to confirm the 35mm cover requirement, rebar cage diameter, and number of spacer layers. 2. Inspect spacers for structural integrity; attach them to the longitudinal main rebar or secure them according to the cage connection details. 3. Arrange spacers around the perimeter and stagger them along the length of the cage, avoiding concentration on one side. 4. Verify that spacers do not interfere with lifting equipment, do not rotate out of alignment, and will not fall off during hoisting and lowering. The placement density depends on the diameter, length, and rigidity of the rebar cage, borehole conditions, and hoisting methods. Spacers may be reinforced at the top of the cage, splicing positions, lifting points, and areas prone to contact with the borehole wall according to technical instructions.

5. INSPECTION AND QUALITY CONTROL

1. Check technical drawings to confirm the 35mm cover requirement, rebar cage diameter, and number of spacer layers. 2. Inspect spacers for structural integrity; attach them to the longitudinal main rebar or secure them according to the cage connection details. 3. Arrange spacers around the perimeter and stagger them along the length of the cage, avoiding concentration on one side. 4. Verify that spacers do not interfere with lifting equipment, do not rotate out of alignment, and will not fall off during hoisting and lowering. The placement density depends on the diameter, length, and rigidity of the rebar cage, borehole conditions, and hoisting methods. Spacers may be reinforced at the top of the cage, splicing positions, lifting points, and areas prone to contact with the borehole wall according to technical instructions.

PRECA Consultant
phone_in_talk 0933 130 035
HO CHI MINH CITY
QL1K, Tan Dong Hiep, Ho Chi Minh City
CENTRAL REGION
33 Dong Da, Quy Nhon, Gia Lai
Please enter your delivery address, and Preca will share the nearest authorized dealers with you.

Related Products

Concrete spacer PCA-100C

Bored pile, Diaphragm wall
barcode_scanner SKU:
PCA-100C
box Quy cách:
45 pcs/box

Concrete spacer PCA-120

Top rebar, Foundation
barcode_scanner SKU:
PCA-120
box Quy cách:
40 pcs/box

Concrete spacer PCA-25/30F

Slab, Beam
barcode_scanner SKU:
PCA-25/30F
box Quy cách:
210 pcs/box

Concrete spacer PCA-30/35/40

Slab, Beam, Column
barcode_scanner SKU:
PCA-30/35/40
box Quy cách:
210 pcs/box